CRCOG is pleased to announce that a Draft Final Report of the Route 44 Corridor Study, dated March 27, 2025, is now available for public review and comment using the link below. This study has been undertaken by CRCOG, with funding from CTDOT, and prepared by the consulting firm Vanasse Hangen Brustlin, Inc. (VHB) under the direction of CRCOG, and the Study Technical Advisory Committee. If you have any comments or suggestions about the study, please contact Pramod Pandey, CRCOG Principal Planner II , at ppandey@crcog.org or 860.724.4216.
The public comment period ends Wednesday, April 30, 2025. Please feel free to share the link with anyone interested.
Draft Report: Draft Final Report: Route 44 Corridor Study
Appendix: Route 44 Canton Final Report Appendix
Study Page: https://crcog.org/rt44/